RCON 05 – Construction of Embankments and Subgrade

This module makes the participants aware of the importance of setting out the working limits for road construction such as calculation of toe lines and their references. It brings to light activities which are generally missed before starting the work leading to eccentric/out-of-alignment formation of embankments. The module makes the participants aware of the methodologies to be adopted under special conditions like -‘ around structures’, ‘on sloping grounds’, ‘under water’ etc.

 

Trainer : Mr. R.P.Sharma

Part 1

1
1 Types of Embankments
2
1.2 Materials and General Requirements
3
1.3 Unsuitable Material
4
1.4 General Requirements, Borrow Materials
5
Quiz for Part 1
4 questions

RCON 05 - Part 2

1
2.1 Construction Operations
2
2.2 Dewatering, Stripping Top Soil, Compacting
3
2.3 Spreading, Grading
4
2.4 Compaction, Field Testing, Finishing Operations
5
Quiz for Part 2
4 questions

RCON 05 - Part 3

1
3.1 Special Conditions
2
3.2 Sloping Grounds, Existing Road Surface
3
Quiz for Part 3 a
2 questions
4
3.3 Around Structures
5
3.4 Over ground incapable of supporting construction equipment
6
3.5 High Embankment, Rock Fill Embankment,
7
Quiz for part 3b
2 questions

Be the first to add a review.

Please, login to leave a review
Enrolled: 74 students
Lectures: 13
Layer 1